8 March 2019 – Last month, the KM3NeT team of CPPM, Marseille together with the ship crews successfully installed an ORCA detection unit. It was the first unit connected to the refurbished main electro-optical cable to shore. After a few weeks of technology tests, the unit is given free for physics runs. ORCA is operational!
Unfortunately, after the deployment of one unit, the winch of the heavy lift line failed and three other units could not be deployed. They will be deployed during the next sea campaign.
In the mean time, KM3NeT researchers have taken up the duty of 24/7 shifts overlooking proper functioning of the detection units at both the ORCA and ARCA site. It is a pleasure to watch good quality data streaming to shore.
Pictures below: Four detection units in their deployment mode on deck of RV Castor (left), the package with the detection unit hanging on the heavy weight lift line just above the water surface (middle) and a plot of the signals that a down-going muon particle leaves in the detection unit: height vs the time of the recorded light signals (right).